The 2 eastbound lanes of Waldo Blvd. between Fleetwood Drive and North 23rd Street are scheduled to be closed to traffic starting around 7 A.M. on Friday, October 6th.
Eastbound traffic on Waldo Blvd. will be rerouted into the westbound lanes of Waldo Blvd. There will only be one lane of traffic in each direction.
The lane closures are needed in order for Northeast Asphalt to place a layer of asphalt over the existing pavement.
It is anticipated that all of the work will be completed and the lanes re-opened to traffic by the end of the work day.
Motorists are urged to slow down and use caution within the construction zone.