Due to the closure of the S 10th St construction project DPI Streets crew with cooperation of the R/R has taken advantage of the street  closing and replaced the pavement at the S 10th St crossing. The track elevation was not altered but the R/R has replaced the bad composite for the crossing. Streets crew replaced the asphalt approaches and the ride is now very much improved. The closure for S 10th St between Grand Ave and Jaycee Dr is now reopened.