Starting tomorrow (June 19th) a road closure is scheduled for street reconstruction.
The patch of road stretches approximately 950 feet through East Albert Drive, where it meets Johnston Drive in Manitowoc.
Engineering Division Manager, Greg Minikel, says “It is anticipated that the entire project will be completed and the street reopened to all traffic around July 21st”.
A detour route will be established to get around the closure on Mirro Drive to Memorial Drive to E. Magnolia Ave to Johnston Drive back to E. Albert Drive, and vice versa.